Our Work
From university research labs to pharmaceutical facilities — every project completed on time, on budget, and built to last. Client names and locations are kept confidential at the request of our partners.
A note on confidentiality: Client names, facility names, and specific locations are withheld at our clients' request. Project details below reflect actual completed work.
Full laboratory renovation for a USA manufacturer — complete casework removal and replacement, new epoxy resin countertops, and integrated lab fixtures throughout. This project required jacking up the building foundation using cutting-edge technology, a complex structural challenge that USLabs coordinated and executed as part of the full scope of work. As with any major renovation, unforeseen conditions emerged during the project — USLabs identified each issue, developed solutions on the fly, and delivered a successfully completed project.

Multi-room laboratory renovation for a milling company — full removal of existing casework across multiple lab spaces, new custom island benches and wall casework installed with epoxy resin countertops, open ceiling work including wiring and service rough-ins, and complete facility cleaning. USLabs managed the entire scope from demolition through final installation across every room.
Phase 1 of a two-phase R&D laboratory renovation for a world leading chemical manufacturer. Their PhD research staff trusted USLabs to deliver — and when Phase 1 was complete, they brought us back for Phase 2.
Phase 2 of the same R&D laboratory renovation for a world leading chemical manufacturer. After completing Phase 1, USLabs was brought back to finish the project.

Laboratory renovation at a major university — complete removal of worn wood casework, aged epoxy countertops, and outdated lab furniture across multiple rooms. USLabs delivered new custom laboratory casework, fresh work surfaces, and service fixtures on schedule with minimal disruption to the academic environment.

New construction science laboratory installation for a K-12 school in Utah — stainless steel casework, wall-mounted upper cabinets, integrated sink bases with lab faucets and eyewash fixtures installed across multiple science lab rooms. Project awarded through our casework manufacturer's relationship with a large General Contractor. Delivered on schedule for school opening.
Completed international laboratory installation featuring full-room blue epoxy-coated steel casework with black epoxy resin countertops, island benches, wall casework runs, integrated sink bases, and overhead extraction arms throughout. A showcase of USLabs' capability to deliver world-class laboratory environments on any continent.
USLabs has delivered complete laboratory solutions across virtually every industry that operates a lab.
Tell us about your space, your timeline, and your goals. We will take it from there.
Contact Us